1.
You are in process of controlling changes to the project scope. All of the following are outputs of this process EXCEPT:

Login/Register to access massive collection of FREE questions and answers.
Login/Register

PMP Certification
Quiz Index
1500 questions in 150 tests. Each test contains 10 questions.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

Idiom of the Day

let off steam
to get rid of your extra energy or strong feelings by doing some activity
The man was angry at first but now he has let off steam and has calmed down.

Word of the Day

  • Most Popular Newspaper In The World
  • Sunil Bharti Mittal
  • Benefits of Bitter Gourd
  • Learn to Swim
  • Summer Health Foods
  • Science Experiments Ideas

  • Most Amazing Fountains Around The World

    City Hall Fountains Downtown Edmonton Canada

    The building features two steel and glass pyramids one 43 metres high ground to peak on top of a three storey concrete structure. One pyramid provides natural light for the main atrium the other for the council chambers. 5 The building also features a 200 foot clock Friendship Tower topped with a 23 carillon bells. 6 Located on the eastern edge of the financial district in Edmontons downtown the building is the main feature on Sir Winston Churchill Square. In the winter the fountain is converted to a skating rink.The design for the city hall met with some controversy when it was first announced. The original design called for the building to be topped with four cones. The cones were meant to pay tribute to the tipis that the First Nations once lived in on the site. The design met with negative feedback from the public as they felt it looked like dunce caps and nuclear reactors. 7 Dub Architects then revised their design to replace the cones with the pyramids with the pyramids designed to be evocative of the Rocky Mountains. The design was received much more warmly by the public and was dubbed Pyramid Power by the press.


    Chourishi Systems