1.
The main difference between the two types (ADM, arrow diagramming method, and PDM, precedence diagramming method) of the critical path method (CPM) of scheduling is:

Login/Register to access massive collection of FREE questions and answers.
Login/Register

PMP Certification
Quiz Index
1500 questions in 150 tests. Each test contains 10 questions.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

Idiom of the Day

get the day off
to have a free day from work
I hope to get the day off tomorrow so I can visit my grandfather in the hospital.

Word of the Day

  • Top Sports Rivalries of All Time
  • Precautions while using Electrical Equipment
  • Weirdest Websites That Rock The Web
  • Summer Health Foods
  • Chandigarh
  • Tips to get ready for Winter

  • Chinese Embroidery

    Cutwork

    Cutwork or cut work, also known as Punto Tagliato in Italian, is a needlework technique in which portions of a textile, typically cotton or linen, are cut away and the resulting hole is reinforced and filled with embroidery or needle lace.Cutwork is related to drawn thread work. In drawn thread work, typically only the warp or weft threads are withdrawn (cut and removed), and the remaining threads in the resulting hole are bound in various ways. In other types of cutwork, both warp and weft threads may be drawn.


    Chourishi Systems