cExams.net
Test # 84


1.
A project manager is selecting team members for her project team. She collects the resumes and past performance reviews for the potential team members and discusses each with their functional manager. Which of the following is not a characteristic that the project manager should use in selecting the team members?

Login/Register to access massive collection of FREE questions and answers.
Login/Register

PMP Certification
Quiz Index
1500 questions in 150 tests. Each test contains 10 questions.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

Idiom of the Day

six of one or half-a-dozen of the other
to be the same, to have no difference between two things
It was six of one or half-a-dozen of the other if we should take the train or the airplane. They both arrived at the same time and cost the same.

Word of the Day

  • Rules to play 8 Ball Pool
  • 101 Words to Admire Somebody
  • Rainy Day Ideas
  • Class 9 - Coordinate Geometry
  • Play Long Jump Games
  • Best Romantic Places In India

  • SuperFood

    Whole Wheat Cracker Flatbread Crispbread

    Whole grain crackers, flatbreads, and crispbreads provide a portable, crunchy whole grain with the convenience of a prepared food. High in fiber and low in fat, they come in a variety of flavors that feature different grains and seeds.
    Nutritional Facts :
    Five whole wheat crackers provide 115 calories, 19 g carbohydrate, 5 g protein, 2 g fat, 4 g dietary fiber, and 1.4 g iron.


    Chourishi Systems